VIDEO: Media witness simulated shutdown of Pilgrim Nuclear Power Station in Plymouth - News - Wicked Local Carver - Carver, MA: Alarms and sirens sound. The main panel in the control room blinks at a rapid rate. Technicians calmly walk to their duty stations and perform the necessary tasks to power down Pilgrim Nuclear Power Station.
No comments:
Post a Comment