Steam generators installed at third Barakah unit
17 August 2016
Installation of the two steam generators has been completed
at unit 3 of the Barakah nuclear power plant under construction in the
United Arab Emirates. All four units at the site should be in operation
by 2020.http://www.world-nuclear-news.org/NN-Steam-generators-installed-at-third-Barakah-unit-1708164.html
No comments:
Post a Comment