Nuclear power in Illinois: Behind the scenes at Byron Generating Station: Byron Generating Station is tightly run. Federal background checks are necessary, security checkpoints are common, radiation monitors are required and visitors are never left alone. There are a minimum of five people in the control room 24/7.
No comments:
Post a Comment