Please utilize Photos For Press as corroborating information of pressreleases.
July, 2011
2011.7.27
Download
Fukushima Daiichi Nuclear Power Station Reactor Building of Unit3 Site Investigation by Quince
Fukushima Daiichi Nuclear Power Station Reactor Building of Unit3 Site Investigation by Quince
- Staircase from 2nd floor to 3rd floor
(pictured on July 26, 2011) - Grating at the valve of Core Spray System
(pictured on July 26, 2011) - Valve of Water Supplement
(pictured on July 26, 2011) - [Reference] Fukushima Daiichi Nuclear Power Station Reactor Building of Unit3 Site Investigation by Quince (PDF 95.4KB)
2011.7.26
Download
- Installation of reactor building cover Unit 1, Fukushima Daiichi Nuclear Power Station(1)
(pictured on July 26, 2011) - Installation of reactor building cover Unit 1, Fukushima Daiichi Nuclear Power Station(2)
(pictured on July 26, 2011)
2011.7.26
Download
- Unloading of the 2nd Cesium Adsorption Facility (SARRY)
(pictured on July 26, 2011) - After unloading of the 2nd Cesium Adsorption Facility (SARRY)
(pictured on July 26, 2011)
July, 2011
2011.7.26
Download
Mr. Amano (IAEA Director General),Visit to Fukushima Daiichi Nuclear Power Station
Mr. Amano (IAEA Director General),Visit to Fukushima Daiichi Nuclear Power Station
- Entrance of Main Anti-Earthquake Building
(pictured on July 25, 2011) - TV Conference Room of Main Anti-Earthquake Building
(pictured on July 25, 2011)
2011.7.18
Download
- Fukushima Daiichi Nuclear Power Station Unit 3 Turbine Building Installation Work of Roof
(pictured on July 18, 2011)
2011.7.17
Download
- Appearance of the Roof for Countermeasure against Rainwater, Unit 3, Fukushima Daiichi
(pictured on July 17, 2011)
2011.7.16
Download
2011.7.14
Download
- Meeting Room at the Fhkushima Daiichi Stabilization Center(1)
(pictured on July 13,2011) - Meeting Room at the Fhkushima Daiichi Stabilization Center(2)
(pictured on July 13,2011)
2011.7.12
Download
- The repaired part for chemical leakage of water treatment system(before repair)
(pictured on July 12, 2011) - The repaired part for chemical leakage of water treatment system(after repair)
(pictured on July 12, 2011)
2011.7.10
Download
- The repaired part for chemical leakage of water treatment system (coagulation settling facility)
(pictured on July 10, 2011)
2011.7.10
Download
- Chemical Injection Leakage Point in the Water Treatment Facility System (Coagulation Settling Equipment)
(pictured on July 10, 2011)
2011.7.9
Download
- Nitrogen injection planned point (after removing stoppage cap)
(pictured on July 8, 2011) - Nitrogen injection planned point (after temporary fitting coupler)
(pictured on July 8, 2011) - High place working vehicle (before shielding)
(pictured on July 7, 2011) - High place working vehicle (after shielding)
(pictured on July 8, 2011) - Access point : Photo by Packbot
(pictured on July 8, 2011)
2011.7.7
Download
- Trial fitting of the cover for Unit 1, Fukushima Daiichi Nuclear Power Station at Onahama port
(pictured on June 24, 2011)
2011.7.6
Download
- Fuel Pool Cooling and Filtering System Valve of Unit 4, Fukushima Daiichi Nuclear Power Station (20B Valve)
(pictured on July 6, 2011)
2011.7.6
Download
- Outside of New Hirono Domitory
(pictured on June 22, 2011) - Inside of New Hirono Domitory
(pictured on June 22, 2011)
2011.7.5
Download
Construction Status of Mitigation of Contamination in the Ocean from Unit 1 to 4(Water intake sliding concrete plate in the screen)
Construction Status of Mitigation of Contamination in the Ocean from Unit 1 to 4(Water intake sliding concrete plate in the screen)
- Upper point of Unit 2 water intake(Before construction)
(pictured on around May, 2011) - Upper point of Unit 2 water intake(After construction)
(pictured on June 30,2011) - Upper point of Unit 2 water intake(Installation work)
(pictured on June 12, 2011) - Unit 2 water intake (from sea side)(After construction (front))
(pictured on June 30,2011) - [Reference]Construction Status of Mitigation of Contamination in the Ocean (PDF 97.2KB)
2011.7.4
Download
- Fukushima Daiichi Nuclear Power Plant Setting steel sheet at the 1st floor of the unit 3 reactor building
(pictured on July 3, 2011)
2011.7.3
2011.7.2
Download
Status of establishing rest areas for workers
(pictured on June 10 - July 2, 2011)
Rest area in front of Main Anti-Earthquake Building
Rest area for operators of Water Treatment Facility
Rest area near Heliport
Rest area near Forest of Wild Bird
Hitachi/GE rest area
Status of establishing rest areas for workers
(pictured on June 10 - July 2, 2011)
Rest area in front of Main Anti-Earthquake Building
- Appearance of the rest area
- Entrance door at the rest area
- Inside the rest area
- Hallway and a local exhauster
Rest area for operators of Water Treatment Facility
Rest area near Heliport
Rest area near Forest of Wild Bird
Hitachi/GE rest area
2011.7.2
Download
Status of preparation for the countermeasures against heat stroke such as Cool Vest
Status of preparation for the countermeasures against heat stroke such as Cool Vest
2011.7.2
Download
2011.7.1
Download
Fulfillment/reinforcement of medical establishment at Fukushima Daiichi Nuclear Power Station (Establishment of an emergency medical room)
(pictured on June 30, 2011)
Fulfillment/reinforcement of medical establishment at Fukushima Daiichi Nuclear Power Station (Establishment of an emergency medical room)
(pictured on June 30, 2011)
2011.7.1
Download
2011.7.1
Download
- Temporary Tide Barrier of Fukushima Daiichi Nuclear Power Station 1
(pictured on June 30, 2011) - Temporary Tide Barrier of Fukushima Daiichi Nuclear Power Station 2
(pictured on June 30, 2011)
2011.7.1
Download
- Spent Fuel Pool in Reactor Building (5th floor), Unit 4, Fukushima Daiichi Nuclear Power Station
(pictured on June 29, 2011)
June, 2011
2011.6.30
Download
- [Reference] Transfer of the low level accumulated water to Megafloat
- Megafloat tied up to around Shallow Draft Quay (Back of the picture)
(pictured on June 25, 2011) - Megafloat tied up to around Shallow Draft Quay (Front of the picture)
(pictured on June 25, 2011)
2011.6.30
Download
Cleaning system for Unit 3, Fukushima Daiichi Nuclear Power Station
Cleaning system for Unit 3, Fukushima Daiichi Nuclear Power Station
- Cleaning system
(pictured on June 28, 2011) - Robot (Worriar)
(pictured in May, 2011)
2011.6.30
Download
2011.6.24
Download
- Top of Reactor Building of Unit 2 Emergency Landing of T-Hawk
(pictured on June 24, 2011)
2011.6.23
Download
2011.6.23
Download
- Temporary Indicator Set-up at Unit 2
(pictured on June 22, 2011)
2011.6.23
Download
- Shielding Wall of Unit 2
(pictured on June 21, 2011)
2011.6.20
Download
- Robot:Quince(4.95MB)
(videoed on Jun 16, 2011)
2011.6.20
Download
- Reference Picture 1 "Initial response at the time of and after the Tohoku-Chihou-Taiheiyo-Oki Earthquake at Fukushima Daiichi Nuclear Power Station"
- Used as power source for instruments
(pictured on March 22, 2011) - Reading confirmed with a light
(pictured on March 23, 2011) - Sagging road
(pictured on March 11, 2011) - Self contained breathing apparatus
(pictured on May 4, 2011) - Tanks thrown by the tsunami
(pictured on March 17, 2011) - Water injection by fire engine truck
(pictured on March 16, 2011) - Explasion at Unit 1 reactor building
(pictured on March 12, 2011) - Damaged Administration Office Building
(pictured on March 29, 2011) - Appearance of Unit 3 after the explosion
(pictured on March 21, 2011)
2011.6.20
Download
- R/B, Unit 4, Fukushima Daiichi Nuclear Power Station Installation work of supporting structure at the bottom of Spent Fuel Pool (Completion of installation of steel support pillars)
- Before installing steel support pillar
(pictured on May 31, 2011) - Installation view of steel support pillar
(pictured on June 20, 2011) - Steel support pillar
(pictured on June 7, 2011)
2011.6.20
Download
Pictures on the opening of the airlock of Unit 2 of Fukushima Daiichi Nuclear Power Station
(taken at 5 am on June 20, 2011)
Pictures on the opening of the airlock of Unit 2 of Fukushima Daiichi Nuclear Power Station
(taken at 5 am on June 20, 2011)
- In front of instrumentation rack
- In front of instrumentation rack (floor)
- Truck bay door (floor)
- Truck bay door
- Stairs at truck bay door
- Stairs at truck bay door (floor)
- Emergency exit 1
- Emergency exit 2
- Personnel doorway
- Airlock
- West side of the airlock
- West side of the airlock (opening space of the airlock)
2011.6.17
Download
2011.6.17
2011.6.15
Download
2011.6.14
Download
2011.6.14
Download
(pictured on June 1, 2011)
Medical check
- [Reference] First-aid room and medical check at Fukushima Daiichi and Daini Nuclear Power Station. (PDF 70.8KB)
- First-aid room and medical check at Fukushima Daiichi and Daini Nuclear Power Station.(ZIP 39.7MB)
(video on July 1-3, 2011)
- Clinic at Main Anti-Earthquake Building(1)
(pictured on June 2, 2011) - Clinic at Main Anti-Earthquake Building(2)
(pictured on June 2, 2011) - Doctor KAYASHIMA from occupational health training center guiding clinic
(pictured on June 3, 2011) - Medical check
(pictured on June 2, 2011)
(pictured on June 1, 2011)
Medical check
- Blood investigation (blood sampling)
- Cardiac electrogram
- Medical check process
- A medical interview (1)
- A medical interview (2)
2011.6.14
Download
Outline of Fukushima Daiichi Nuclear Power Plant unit1reactor building covering plan
Outline of Fukushima Daiichi Nuclear Power Plant unit1reactor building covering plan
- High-precision 3D measurement by laser scan(ZIP 6.86MB)
- Removal process of roof panels(ZIP 46.4MB)
- Construction process(ZIP 52.4MB)
- Beam-to-column connection(ZIP 103MB)
- Trial construction of cover unit (Onahama port)
(pictured on June 12, 2011) - Cover construction model
- Fukushima Daiichi Nuclear Power Plant unit1reactor building covering image
- Beam-to-column connection
- A montage of laser scan data and construction data 1
- A montage of laser scan data and construction data 2
2011.6.11
Download
- Skid of Water Treatment Facility of Fukushima Daiichi Nuclear Power Station
(pictured on June 3, 2011) - Side Part of Skid of Water Treatment Facility
(pictured on June 9, 2011) - Coupling Parts of Inlet and Outlet of Cesium Adsorption Tower
(pictured on June 9, 2011)
2011.6.11
Download
- 4th Floor of Unit 4 Reactor Building
(pictured on June 10, 2011)
Pictured at South Side on 4th floor of Unit 4 Reactor Building - Side Part of Skid of Water Treatment Facility of Fukushima Daiichi Nuclear Power Station
(pictured on June 9, 2011)
Pictured at South Side on 4th floor of Unit 4 Reactor Building
2011.6.11
Download
- [Reference] Shooting route of Gamma Camera at reactor building of Unit 3 in Fukushima Daiichi Nuclear Power Station (PDF 66.9KB)
- *1 near Large Machine Hatch of Unit 3 Fukushima Daiichi
- *2 Side Part of Skid of Water Treatment Facility of Fukushima Daiichi Nuclear Power Station
(pictured on June 9, 2011)
2011.6.11
Download
*pictured through vinyl which covers the camera on June 11, 2011
*pictured through vinyl which covers the camera on June 11, 2011
- Inside of Unit 2 Turbine Building of Fukushima Daiichi (Inside of Northern Air-house)
- Inside of Unit 2 Turbine Building of Fukushima Daiichi (Outside of Northern Air-house)
- Inside of Unit 2 Turbine Building of Fukushima Daiichi (pictured towards north, standing against Southern Air-house)
- Inside of Unit 2 Radiation Waste Treatment Facility of Fukushima Daiichi (Filtering Unit)
2011.6.10
Download
Transportation of large tank to Fukushima Daiichi Nuclear Power Station
Transportation of large tank to Fukushima Daiichi Nuclear Power Station
- Transshipping work to the trailer specially arranged for the area of 20km raduis from the power station
(pictured on June 5, 2011)
Place:Materials yard near the J Village - Installation work of tanks
(pictured on June 9, 2011)
Place:Inside Fukushima Daiichi Nuclear Power Station
2011.6.10
Download
【Fukushima Daiichi Nuclear Power Station Status of setting rest areas】
【Fukushima Daiichi Nuclear Power Station Status of setting rest areas】
- [Reference]Status of setting Rest Area(PDF 57.6KB)
- Service Building of Unit5,6 1st floor Rest Area
(pictured on May 19, 2011) - Service Building of Unit5,6 1st floor inside the Rest Area (1)
(pictured on May 19, 2011) - Service Building of Unit5,6 1st floor inside the Rest Area (2)
(pictured on May 19, 2011) - Service Building of Unit5,6 1st floor Doorway in fron of the Rest Area
(pictured on May 19, 2011) - Storage space of Rest Area in front of Main Anti-Earthquake Building
(pictured on May 19, 2011) - Appearance of the Rest Area in front of Main Anti-Earthquake Building
(pictured on May 19, 2011) - Inside the Rest Area in front of Main Anti-Earthquake Building
(pictured on May 19, 2011) - Facilities of the Rest Area in front of Main Anti-Earthquake Building
(pictured on May 19, 2011) - Inside the Rest Area of former Emergency Response Measure Room (1)
(pictured on June 9, 2011) - Inside the Rest Area of former Emergency Response Measure Room (2)
(pictured on June 9, 2011) - Local Exhauster of the Rest Area of former Emergency Response Measure Room
(pictured on June 9, 2011) - Drinkable Water of the Rest Area of former Emergency Response Measure Room
(pictured on June 9, 2011) - Appearance of Toshiba Rest Area
(pictured on May 15, 2011) - Inside of Toshiba Rest Area
(pictured on May 15, 2011) - Wiping Feet Place of Toshiba Rest Area
(pictured on May 15, 2011) - Drinkable Water of Toshiba Rest Area
(pictured on May 15, 2011)
2011.6.10
Download
【Fukushima Daini Nuclear Power Station Status of improvement on working conditions】
【Fukushima Daini Nuclear Power Station Status of improvement on working conditions】
- Shower Room in Gymnastic hall
(pictured on June 8, 2011) - Drinkable Water of Gymnastic hall
(pictured on May 24, 2011) - Double-deck bed in Gymnastic hall(1)
(pictured on May 14, 2011) - Double-deck bed in Gymnastic hall(2)
(pictured on May 14, 2011)
2011.6.8
Download
- [Reference] The summary drawing of air leakage from the main exhaust duct, Unit 4, Fukushima Daini Nuclear Power Station(PDF 144KB)
- (1)place of leakage
(pictured on June 8, 2011) - (2)place of leakage
(pictured on June 8, 2011) - place of leakage *two parts
(pictured on June 7, 2011)
2011.6.8
Download
- Reactor Building, Unit 4, Fukushima Daiichi Nuclear Power Station Installation of support pillars at the bottom of the Spent Fuel Pool(PDF 130KB)
- Steel support pillars
(pictured on 2:00 PM, June 7, 2011) - Installation of steel support pillars
(pictured on 2:00 PM, June 7, 2011) - Steel support pillars(highlighted in color are pillars)
(pictured on 2:00 PM, June 7, 2011)
2011.6.5
Download
- [Reference] Image of General Meeting at Emergency Disaster Restoration Room in Fukushima Daiichi Nuclear Power Station(PDF 80.0KB)
- Situation of General Meeting at Emergency Disaster Restoration Room in Fukushima Daiichi Nuclear Power Station(ZIP 38.9MB)
(video on May 24, 2011 - May 30, 2011) - General Meeting at Emergency Disaster Restoration Room in Fukushima Daiichi Nuclear Power Station
(pictured on 7:00 PM, May 24, 2011) - General Meeting at Emergency Disaster Restoration Room in Fukushima Daiichi Nuclear Power Station
(pictured on 9:00 AM, May 25, 2011) - General Meeting at Emergency Disaster Restoration Room in Fukushima Daiichi Nuclear Power Station
(pictured on 9:00 AM, May 27, 2011) - General Meeting at Emergency Disaster Restoration Room in Fukushima Daiichi Nuclear Power Station
(pictured on 7:00 PM, May 28, 2011) - General Meeting at Emergency Disaster Restoration Room in Fukushima Daiichi Nuclear Power Station
(pictured on 9:00 AM, May 30, 2011 (1)) - General Meeting at Emergency Disaster Restoration Room in Fukushima Daiichi Nuclear Power Station
(pictured on 9:00 AM, May 30, 2011 (2)) - General Meeting at Emergency Disaster Restoration Room in Fukushima Daiichi Nuclear Power Station
(pictured on 9:00 AM, May 30, 2011 (3))
2011.6.5
Download
- High dose rubble in the west side of Unit 3 reactor building of Fukushima Daiichi Nuclear Power Station
(pictured on June 4, 2011)
2011.6.5
Download
2011.6.4
Download
Fukushima Daiichi Nuclear Power Station Temporary reactor pressure indicators
(pictured on June 3, 2011)
Place:North side of the 1st floor of the reactor building, Unit 1
Fukushima Daiichi Nuclear Power Station Temporary reactor pressure indicators
(pictured on June 3, 2011)
Place:North side of the 1st floor of the reactor building, Unit 1
- Temporary reactor pressure indicators
(pictured on June 3, 2011) - scene of work
(pictured on June 3, 2011)
2011.6.4
Download
2011.6.4
Download
Outline of water processing facilities
Outline of water processing facilities
- Fukushima Daiichi Nuclear Power Station Outline of water processing facilities
(PDF 70.1KB) - Oil Seperation Device
(pictured on May 11, 2011) - Cesium Absorption Tower(side view)
(pictured on June 1, 2011) - Cesium Absorption Tower(whole view)
(pictured on June 1, 2011) - Chemical Tank
(pictured on May 31, 2011) - Decontamiation Device
(pictured on May 31, 2011) - Desalination Device(main facility)
(pictured on May 31, 2011) - Water Treatment Tank
(pictured on June 1, 2011) - control room
(pictured on May 17, 2011)
2011.6.2
Download
Fukushima Daiichi Nuclear Power Station Temporary storage tank (for the purpose of low level radioactive materials in Unit 5 and 6) installation status
Place:Storage Area(North Side)
Fukushima Daiichi Nuclear Power Station Temporary storage tank (for the purpose of low level radioactive materials in Unit 5 and 6) installation status
Place:Storage Area(North Side)
- square-shaped tank
(pictured on May 4, 2011) - round-shaped tank(1)
(pictured on May 11, 2011) - round-shaped tank(2)
(pictured on May 27, 2011)
2011.6.1
Download
- Circulating Seawater Purification Equipment at the Fukushima Daiichi Nuclear Power Station
(pictured on June 1, 2011)
May, 2011
2011.5.31
Download
- Oil slick near the cartain wall of the Unit 5 and 6
(pictured on March 31, 2011)
Place: Near the cartain wall of the Unit 5 and 6
2011.5.29
Download
Inside the Reactor Building, Unit 4, Fukushima Daiichi Nuclear Power Station
Inside the Reactor Building, Unit 4, Fukushima Daiichi Nuclear Power Station
- 1st Floor, Inside wall
(pictured on May 20,2011) - 1st Floor, Outside wall(1)
(pictured on May 20,2011) - 1st Floor, Outside wall(2)
(pictured on May 20,2011) - 1st Floor, Ceiling
(pictured on May 20,2011) - 2nd Floor, Inside wall(1)
(pictured on May 19,2011) - 2nd Floor, Outside wall
(pictured on May 19,2011) - 2nd Floor, Shell wall(1)
(pictured on May 19,2011) - 2nd Floor, Shell wall(2)
(pictured on May 19,2011) - Spent Fuel Pool, lower part
(pictured on May 21,2011) - 2nd Floor, Floor
(pictured on May 19,2011) - 2nd Floor, Ceiling(1)
(pictured on May 19,2011) - 2nd Floor, Inside wall(2)
(pictured on May 20,2011) - 2nd Floor, Ceiling(2)
(pictured on May 20,2011)
2011.5.28
Download
- Spraying dust inhibitor at Fukushima Daiichi Nuclear Power Station(1)(ZIP 19.8MB)
(video on May 27, 2011) - Spraying dust inhibitor at Fukushima Daiichi Nuclear Power Station(2)
(pictured on May 27, 2011) - Spraying dust inhibitor at Fukushima Daiichi Nuclear Power Station(3)
(pictured on May 27, 2011)
2011.5.27
Download
IAEA Fukushima Visit(Pictured on May 27, 2011)
IAEA Fukushima Visit(Pictured on May 27, 2011)
- Fukushima Daini Nuclear Power Station, Back up office 1
(10:10 am, May 27, 2011) - Fukushima Daini Nuclear Power Station, Back up office 2
(10:28 am, May 27, 2011) - Fukushima Daiichi Nuclear Power Station, Around Unit 3
(1:26 pm, May 27, 2011) - Fukushima Daiichi Nuclear Power Station, Main Anti-Earthquake Building
(3:03 pm, May 27, 2011)
2011.5.24
Download
- Picture regarding sampling of radioactive materials in the air above reactor building of Fukushima Daiichi Nuclear Power Station Unit 1
(pictured on May 22, 2011) - Picture regarding sampling of radioactive materials in the air above reactor building of Fukushima Daiichi Nuclear Power Station Unit 4
(pictured on May 23, 2011)
2011.5.24
Download
Fukushima Daiichi Nuclear Power Station pictures taken from the observation deck
(March 16, 17 and April 6, 2011)
March 16, 2011
5:00 /6:00 /7:00 /8:00 /9:00 /10:00 /11:00 /12:00
13:00 /14:00 /15:00 /16:00 /17:00 /18:00 /19:00
March 17, 2011
5:00 /6:00 /7:00 /8:00 /9:00 /10:00 /11:00 /12:00
13:00 /14:00 /15:00 /16:00 /17:00 /18:00 /19:00
April 6, 2011
5:00 /6:00 /7:00 /8:00 /9:00 /10:00 /11:00 /12:00
13:00 /14:00 /15:00 /16:00 /17:00 /18:00 /19:00
*We apologize for the inconvenience caused to those who were unable to see the pictures due to congestion of access and communication line trouble
Fukushima Daiichi Nuclear Power Station pictures taken from the observation deck
(March 16, 17 and April 6, 2011)
March 16, 2011
5:00 /6:00 /7:00 /8:00 /9:00 /10:00 /11:00 /12:00
13:00 /14:00 /15:00 /16:00 /17:00 /18:00 /19:00
March 17, 2011
5:00 /6:00 /7:00 /8:00 /9:00 /10:00 /11:00 /12:00
13:00 /14:00 /15:00 /16:00 /17:00 /18:00 /19:00
April 6, 2011
5:00 /6:00 /7:00 /8:00 /9:00 /10:00 /11:00 /12:00
13:00 /14:00 /15:00 /16:00 /17:00 /18:00 /19:00
*We apologize for the inconvenience caused to those who were unable to see the pictures due to congestion of access and communication line trouble
2011.5.22
Download
Inside the Reactor Building, Unit 1, Fukushima Daiichi Nuclear Power Station (Pictured on May 20th, 2011)
Inside the Reactor Building, Unit 1, Fukushima Daiichi Nuclear Power Station (Pictured on May 20th, 2011)
- From the large equipment service entrance to the south side airlock
(May 22, 2011) - From the large equipment service entrance to the south side airlock (gamma camera)
(May 22, 2011) - Around the large equipment service entrance
(May 22, 2011) - Around the large equipment service entrance (gamma camera)
(May 22, 2011)
2011.5.21
Download
- Fukushima Daiichi Nuclear Power Station Mega Float entering the port (1)
(Photo was taken at around 9:09 to 9:35 am on May 21, 2011) - Fukushima Daiichi Nuclear Power Station Mega Float entering the port (2)
(Photo was taken at around 9:09 to 9:35 am on May 21, 2011) - Fukushima Daiichi Nuclear Power Station Mega Float alongside the quay
(Photo was taken at around 9:35 am on May 21, 2011)
2011.5.21
Download
- Fukushima Daiichi Nuclear Power Station Rubble around the reactor building (1)
(pictured on May 21, 2011) - Fukushima Daiichi Nuclear Power Station Rubble around the reactor building (1) (with a caption)
(pictured on May 21, 2011) - Fukushima Daiichi Nuclear Power Station Rubble around the reactor building (2)
(pictured on May 21, 2011)
2011.5.20
Download
- gamma camera
(pictured on May 19th, 2011) - gamma camera control pannel
(pictured on May 19th, 2011)
2011.5.19
Download
The first floor, inside the reactor building of Fukushima Daiichi Nuclear Power Station Unit 2
(pictured on May 18th, 2011)
1 / 2 / 3 / 4 / 5 / 6 / 7
The first floor, inside the reactor building of Fukushima Daiichi Nuclear Power Station Unit 2
(pictured on May 18th, 2011)
1 / 2 / 3 / 4 / 5 / 6 / 7
2011.5.19
Download
Pictures of Tsunami that hit the Fukushima Daiichi Nuclear Power Station
(pictured on March 11, 2011)
Place: North side of Radiation Waste Treatment Facility taken from 4th floor
Pictures of Tsunami that hit the Fukushima Daiichi Nuclear Power Station
(pictured on March 11, 2011)
Place: North side of Radiation Waste Treatment Facility taken from 4th floor
- Approximately at 3:42 pm (1)
- Approximately at 3:42 pm (2)
- Approximately at 3:43 pm (1)
- Approximately at 3:43 pm (2)
- Approximately at 3:43 pm (3)
- Approximately at 3:44 pm (1)
- Approximately at 3:44 pm (2)
- Approximately at 3:44 pm (3)
- Approximately at 3:46 pm
- Approximately at 3:49 pm
- Approximately at 3:57 pm
2011.5.19
Download
Pictures of Tsunami that hit the Fukushima Daiichi Nuclear Power Station
(pictured on March 11, 2011)
Place: The slope at the eastern side of Radioactive Solid Waste Storage Facility (The east side of Unit5 taken from the southern side of the unit)
Taken by: TEPCO's affiliate company
1 / 2 / 3 / 4 / 5 / 6
Pictures of Tsunami that hit the Fukushima Daiichi Nuclear Power Station
(pictured on March 11, 2011)
Place: The slope at the eastern side of Radioactive Solid Waste Storage Facility (The east side of Unit5 taken from the southern side of the unit)
Taken by: TEPCO's affiliate company
1 / 2 / 3 / 4 / 5 / 6
2011.5.18
Download
Departure of barge from Fukushima Daiichi Nuclear Power Station to Fukushima Daini Nuclear Power Station
Departure of barge from Fukushima Daiichi Nuclear Power Station to Fukushima Daini Nuclear Power Station
- barge(front) and tagboat(back)
(pictured on May 18th, 2011)
2011.5.17
Download
- Fukushima Daiichi Nuclear Power Station Current status of restoration work(48.3MByte)
(video on May 6th, 2011)
- Reactor buildings of Unit 1 and 2
- Truck with nitrogen supply equipment
- Car swept up by Tsunami
- Removal of rubble by an unmanned heavy machinery
- Crawler dump truck for spraying dust inhibitor
- Spraying dust inhibitor by a crawler dump truck
- Water spray to the spent fuel pool of Unit 4 by a concrete pumping vehicle
- Temporary substation for Unit 1 and 2
- Concrete placement to the vertical shaft of Unit 2 (1)
- Concrete placement to the vertical shaft of Unit 2 (2)
- Dust inhibitor sprayed around the circulating water pump of Unit 3
- Cable trench pit for the water intake of Unit 2
- Screen room of Unit 2
- Steel sheet piles at the water intake of Unit 2
- Silt fence installed around the water intake of Unit 2
- Temporary motor driven pump for water injection to the reactors of Unit1 to 3
- Heavy oil tank swept up by Tsunami
- Suppression pool's water surge-tank near Unit 5 and 6
- Ultrahigh voltage switching station of Unit 5 and 6
- Temporary tank installed near Unit 5 and 6 (1)
- Temporary tank installed near Unit 5 and 6 (2)
- Building for diesel generator 6B of Unit 6
- Rubble container
- Transfer of container
- Administration Office Building (exterior)
- Administration Office Building (interior 1)
- Administration Office Building (interior 2)
- 1st floor of the turbine building of Unit 1(1)
- 1st floor of the turbine building of Unit 1(2)
- Local exhauster installed in the turbine building of Unit 1
- Positive pressure room installed at the turbine building of Unit 1
- Entrance of Main Anti-Earthquake Building(A prefabricated house used for access control)
- Measurement of radioactivity in Main Anti-Earthquake Building
- Spare protective equipments(1)
- Spare protective equipments(2)
- Entrance of Main Anti-Earthquake Building(from inside)
- Emergency headquarters
- Water supply area of Main Anti-Earthquake Building
- Passing forward daily commodities in Main Anti-Earthquake Building
- Encouraging messages posted on the walls of Main Anti-Earthquake Building
2011.5.15
Download
Fukushima Daiichi Nuclear Power Station, Mega Float photographic image
Fukushima Daiichi Nuclear Power Station, Mega Float photographic image
- Mega Float (at approximately 5:20 am)
(pictured on May 15th, 2011) - Mega Float, in the offing (1) (from approximately 5:20 am to approximately 5:50 am)
(pictured on May 15th, 2011) - Mega Float, in the offing (2) (from approximately 5:20 am to approximately 5:50 am)
(pictured on May 15th, 2011)
2011.5.14
Download
Carrying Work for New Cooling System (Air-cooled) for Residual Heat Removal System in Fukushima Daiichi Nuclear Power Station
(pictured on May 13th,2011)
Carrying Work for New Cooling System (Air-cooled) for Residual Heat Removal System in Fukushima Daiichi Nuclear Power Station
(pictured on May 13th,2011)
2011.5.14
Download
The implementation status of Emergency Response Training at Fukushima Daini Nuclear Power Station
Please refer to "[Reference] Emergency Response Training at Fukushima Daini Nuclear Power Station" for the explanation of each picture.
The implementation status of Emergency Response Training at Fukushima Daini Nuclear Power Station
Please refer to "[Reference] Emergency Response Training at Fukushima Daini Nuclear Power Station" for the explanation of each picture.
- Emergency Response Room 1
(pictured on May 13th, 2011) - Emergency Response Room 2
(pictured on May 13th, 2011) - Deploying a power-supply car to the reactor building (Unit 1)
(pictured on May 13th, 2011) - Connecting power cables (Unit 1)
(pictured on May 13th, 2011) - Pouring the water into a temporary pool in the reactor building (Unit 4)
(pictured on May 13th, 2011) - Transporting the water to the reactor building using a fire engine (Unit 1)
(pictured on May 13th, 2011) - Installing a back up nitrogen gas cylinder to drive valves (Unit 3) 1
(pictured on May 13th, 2011) - Installing a back up nitrogen gas cylinder to drive valves (Unit 3) 2
(pictured on May 13th, 2011) - Carrying out a mock generator (turbine building at Unit 4)
(pictured on May 13th, 2011) - Transporting to seawater condenser building at Unit 4
(pictured on May 13th, 2011)
2011.5.12
Download
2011.5.12
Download
2011.5.11
Download
2011.5.11
Download
- The situation of inflow to the pit near intake canal of Fukushima Daiichi Nuclear Power Station Unit 3.
(pictured on May 11th, 2011)
2011.5.10
Download
- Status of the Spent Fuel Pool of Unit 3 of Fukushima Daiichi Nuclear Power Station (30MByte)
(video on May 8th, 2011)
2011.5.10
Download
2011.5.9
Download
- Northwest side of the first floor, Fukushima Daiichi Nuclear Power Station Unit1
(pictured on May 9th, 2011) - North side of the second floor, Fukushima Daiichi Nuclear Power Station Unit1
(pictured on May 9th, 2011)
2011.5.8
2011.5.8
Download
Fukushima Daiichi Nuclear Power Station
Status of Improved Working Environment Inside of Reactor Building of Unit 1
Fukushima Daiichi Nuclear Power Station
Status of Improved Working Environment Inside of Reactor Building of Unit 1
- First Floor of Turbine Building of Unit 1
(video on May 6th, 2011)
2011.5.6
Download
- Inside the reactor building of Fukushima Daiichi Nuclear Power Station Unit 1 (Measurement of radiation dose)
(pictured on May 5th, 2011) - Situation of duct installation inside the reactor building of Fukushima Daiichi Nuclear Power Station Unit 1 (Photo taken from inside the building toward the double-entry doors)
(pictured on May 5th, 2011)
2011.5.5
Download
- The ambient air filtration system (Alara Venti Jumbo)
(pictured on May 3rd, 2011)
2011.5.3
Download
- Site observation by the packbot in the nuclear reactor building of Unit 1
(video on April 29th, 2011)
April, 2011
2011.4.29
Download
- The spent fuel pool of Unit 4, Fukushima Daiichi Nuclear Power Station
(video on April 28th, 2011) - Site observation by the packbot in the nuclear reactor building of Unit 1
(video on April 26th, 2011)
2011.4.28
Download
- Fukushima Daiichi Nuclear Power Station Around Shiomizaka /former Welfare Building 1
(pictured on April 13th, 2011) - Fukushima Daiichi Nuclear Power Station Around Shiomizaka /former Welfare Building 2
(pictured on April 13th, 2011) - Fukushima Daiichi Nuclear Power Station Around Shiomizaka /former Welfare Building 3
(pictured on April 13th, 2011) - Fukushima Daiichi Nuclear Power Station Around north side of 1R/B 1
(pictured on April 18th, 2011) - Fukushima Daiichi Nuclear Power Station Around north side of 1R/B 2
(pictured on April 21st, 2011) - Fukushima Daiichi Nuclear Power Station Around west side of 1R/B 1
(pictured on April 13th, 2011) - Fukushima Daiichi Nuclear Power Station Around west side of 1R/B 2
(pictured on April 23rd, 2011)
2011.4.28
Download
- Provided by Chiba Institute of Technology (Excerpt from HP)
(pictured on April 20th, 2011) - talon(Provided by QinetiQ)
- talon(A photo Taken by TEPCO employee at Onahama Coal Center)
(pictured on April 22nd, 2011) - Packbot(Provided by iRobot)
- Fukushima Daiichi Nuclear Power Station Southwest side of the nuclear reactor building of Unit 4
(pictured on April 20th, 2011) - A truck(Provided by Japan Atomic Energy Agency(JAEA))
(pictured on April 22nd, 2011) - inside photo(A photo Taken by TEPCO employee at Onahama Coal Center)
(pictured on April 22nd, 2011)
2011.4.27
Download
Movies taken from T-Hawk
(video on April 21st, 2011)
Pictures taken from T-Hawk
(pictured on April 21st, 2011)
Movies taken from T-Hawk
(video on April 21st, 2011)
Pictures taken from T-Hawk
(pictured on April 21st, 2011)
2011.4.27
2011.4.27
Download
Site observation by the packbot in the nuclear reactor building of Unit 1
(pictured on April 26th, 2011)
Site observation by the packbot in the nuclear reactor building of Unit 1
(pictured on April 26th, 2011)
2011.4.26
Download
- Remote-controlled crawler dump
(pictured on April 15th, 2011)
2011.4.20
Download
The videos were taken by the Packbot inside the nuclear reactor building of Fukushima Daiichi Nuclear Power Station
The videos were taken by the Packbot inside the nuclear reactor building of Fukushima Daiichi Nuclear Power Station
- 1st Floor, Nuclear Reactor Building, Unit 1
(video on April 17th, 2011) - 1st Floor, Nuclear Reactor Building, Unit 2
(video on April 18th, 2011)
- 1st Floor, Nuclear Reactor Building, Unit 3
(video on April 17th, 2011)
2011.4.19
Download
The photos were taken by the Packbot inside the nuclear reactor building of Fukushima Daiichi Nuclear Power Station
The photos were taken by the Packbot inside the nuclear reactor building of Fukushima Daiichi Nuclear Power Station
- 1st Floor, Nuclear Reactor Building, Unit 1
(pictured on April 17th, 2011) - 1st Floor, Nuclear Reactor Building, Unit 2
(pictured on April 18th, 2011) - 1st Floor, Nuclear Reactor Building, Unit 3
(pictured on April 17th, 2011)
2011.4.18
Download
Movie and pictures of Emergency Response Headquarters for the Accident in Fukushima Nuclear Power Stations
(Video and pictured on April 15th, 2011)
Movie and pictures of Emergency Response Headquarters for the Accident in Fukushima Nuclear Power Stations
(Video and pictured on April 15th, 2011)
- The conference of Emergency Response Headquarters for the Accident in Fukushima Nuclear Power Stations held on April 15th, 2011
- Banri Kaieda, Minister of Economy, Trade and Industry 1
- Banri Kaieda, Minister of Economy, Trade and Industry 2
- Goshi Hosono, Special Advisor to the Prime Minister 1
- Goshi Hosono, Special Advisor to the Prime Minister 2
- Banri Kaieda, Minister of Economy,Trade and Industry and Goshi Hosono,Special Advisor to the Prime Minister 1
- Banri Kaieda, Minister of Economy,Trade and Industry and Goshi Hosono,Special Advisor to the Prime Minister 2
- picture of the conference 1
- picture of the conference 2
- picture of the conference 3
- picture of the conference 4
- picture of the conference 5
2011.4.17
Download
Packbot working inside the reactor building of Fukushima Daiichi Nuclear Power Station Unit 3.
(pictured on April 17th, 2011)
Packbot working inside the reactor building of Fukushima Daiichi Nuclear Power Station Unit 3.
(pictured on April 17th, 2011)
2011.4.16
Download
Movies taken from T-Hawk, Reactor Building, Unit 1, 3,4 Fukushima Daiichi Nuclear Power Station
Movies taken from T-Hawk, Reactor Building, Unit 1, 3,4 Fukushima Daiichi Nuclear Power Station
- Unit 1 ,3,4(1/3)
(Video on April 15th, 2011) - Unit 1 ,3,4(2/3)
(Video on April 15th, 2011) - Unit 1 ,3,4(3/3)
(Video on April 15th, 2011)
- Unit 1,Roof of Reactor Building
(pictured on April 15th, 2011) - Unit 3,Reactor Building 1
(pictured on April 15th, 2011) - Unit 3,Reactor Building 2
(pictured on April 15th, 2011) - Unit 3,Roof of Reactor Building
(pictured on April 15th, 2011) - Unit 4,South Side of Reactor Building
(pictured on April 15th, 2011) - Unit 4,Upper Side of Spent Fuel Pool,Reactor Building
(pictured on April 15th, 2011) - Unit 4,Seashore Side of Reactor Building
(pictured on April 15th, 2011) - Unit 4,Operation Floor of Reactor Building 1
(pictured on April 15th, 2011) - Unit 4,Operation Floor of Reactor Building 2
(pictured on April 15th, 2011) - Unit 4,Roof of Reactor Building
(pictured on April 15th, 2011)
2011.4.16
Download
- a sandbag containing zeolite
Shooting date: April 15th, 2011
Shooting location: the south side of the screen of Unit 3 of the
Fukushima Daiichi Nuclear Power Station
2011.4.15
Download
Sampling of water in the spent fuel pool of Unit 4, Fukushima Daiichi Nuclear Power Station
(pictured on April 14th, 2011)
The temporary storage tank at Fukushima Daiichi Nuclear Power Station
(pictured on April 14th, 2011)
A picture taken from the concrete pumping vehicle, the spent fuel pool, Unit3, Fukushima Daiichi Nuclear Power Station
(pictured on April 14th, 2011)
Sampling of water in the spent fuel pool of Unit 4, Fukushima Daiichi Nuclear Power Station
- Sampling in Spent Fuel Pool of Unit 4
(Video on April 12th, 2011) - Pulling up
(pictured on April 12th, 2011) - At the surface of the pool
(pictured on April 12th, 2011) - Sampling water from the pool
(pictured on April 12th, 2011)
(pictured on April 14th, 2011)
The temporary storage tank at Fukushima Daiichi Nuclear Power Station
(pictured on April 14th, 2011)
A picture taken from the concrete pumping vehicle, the spent fuel pool, Unit3, Fukushima Daiichi Nuclear Power Station
(pictured on April 14th, 2011)
2011.4.13
Download
- Cask for 38 fuel assembly BWR Type
Provide by Tokyo Electric Power Compay
2011.4.12
Download
- Discharge canal sampling building of Unit 1-4 at Fukushima Daiichi Nuclear Power Station located around the ocean-side discharge canal (When fire was detected)
(pictured on April 12th, 2011) - Discharge canal sampling building of Unit 1-4 at Fukushima Daiichi Nuclear Power Station located around the ocean-side discharge canal (After initial extinction)
(pictured on April 12th, 2011) - Intake canal of Fukushima Daiichi Nuclear Power Plant (Before installing steel water bars)
(pictured on April 12th, 2011) - Sampling of water from the spent fuel pool in Unit4 of Fukushima Daiichi Nuclear Power Station
(pictured on April 12th, 2011)
(Fukushima Daiichi Nuclear Power Station)
Pictures of the damages caused by the tsunami at Fukushima Daiichi Nuclear Power Station
Download
Pictures of the damages caused by the tsunami at Fukushima Daiichi Nuclear Power Station
Download
(Fukushima Daini Nuclear Power Station)
Pictures of the damages caused by the tsunami at Fukushima Daini Nuclear Power Station
Download
Pictures of the damages caused by the tsunami at Fukushima Daini Nuclear Power Station
Download
2011.4.11
Download
- Reactor building of Unit1-2 at Fukushima Daiichi Nuclear Power Station
(pictured on April 10th, 2011) - Reactor building of Unit1 at Fukushima Daiichi Nuclear Power Station
(pictured on April 10th, 2011) - Reactor building of Unit2 at Fukushima Daiichi Nuclear Power Station
(pictured on April 10th, 2011) - Reactor building of Unit3 at Fukushima Daiichi Nuclear Power Station(1)
(pictured on April 10th, 2011) - Reactor building of Unit3 at Fukushima Daiichi Nuclear Power Station(2)
(pictured on April 10th, 2011) - Reactor building of Unit3 at Fukushima Daiichi Nuclear Power Station(closeup-picture)
(pictured on April 10th, 2011) - Reactor building of Unit4 at Fukushima Daiichi Nuclear Power Station
(pictured on April 10th, 2011) - Reactor building of Unit4 at Fukushima Daiichi Nuclear Power Station(closeup-picture)
(pictured on April 10th, 2011) - Reactor building of Unit1-2 at Fukushima Daiichi Nuclear Power Station(mountain-side)
(pictured on April 10th, 2011) - Reactor building of Fukushima Daiichi Nuclear Power Station(mountain-side)
(pictured on April 10th, 2011) - Silt fence
(pictured on April 10th, 2011) - Remote-controlled rubble removing equipment
(pictured on April 10th, 2011) - Operation of Remote-controlled rubble removing equipment
(pictured on April 10th, 2011) - Photo of Reactor building of Unit3-4 at Fukushima Daiichi Nuclear Power Station by remote-controlled mini helicopter
(Video on April 10th, 2011)
2011.4.11
Download
Removal of Rubbles by Remotely Controlled Heavy Machinery (System 1)(pictured on April 6th, 2011)
Loading of Rubbles (approx.2 hours)
Temporary Rubble Yard (approx. 1 hour)
Removal of Rubbles by Remotely Controlled Heavy Machinery (System 1)(pictured on April 6th, 2011)
Loading of Rubbles (approx.2 hours)
Temporary Rubble Yard (approx. 1 hour)
2011.4.9
Download
- The tsunami which attacked Fukushima Daiichi Nuclear Power Station
(Video on March 11th, 2011) - Around the entrance of main building at Fukushima Daiichi Nuclear Power Station
(pictured on March 29th, 2011) - The 2nd floor of main building at Fukushima Daiichi Nuclear Power Station
(pictured on March 29th, 2011) - The 1st floor of main building at Fukushima Daiichi Nuclear Power Station
(pictured on March 29th, 2011)
2011.4.8
Download
- Picture of a disaster relief leaders meeting at Fukushima Daiichi Power Station :Photo1
(pictured on April 1st, 2011) - Picture of a disaster relief leaders meeting at Fukushima Daiichi Power Station :Photo2
(pictured on April 1st, 2011) - Lead boards placed on the windows of Emergency response room with a base-isolation structure at Fukushima Daiichi Power Plant (to decrease radiation dose within the building) :on March 27th
(pictured on March 31st, 2011) - Added 2 ventilating machines (in total, 5 machines) with charcoal filters (to increase the efficiency of removal of the contaminated material) :on March 30
(pictured on March 31st, 2011) - Installed de-contamination area of the quake-proof building (to expand the radiological protection space) :on March 26
(pictured on March 31st, 2011)
2011.4.7
Download
- Arrival of "Mega Float" at the Yokohama port:photo1
(pictured on April 7th, 2011) - Arrival of "Mega Float" at the Yokohama port:photo2
(pictured on April 7th, 2011)
2011.4.6
Download
- Shutoff of water outflow was confirmed at approx. 5:38 am on April 6th, 2011.
(pictured on April 6th, 2011)
2011.4.2
Download
- Near of the Sea Water intake of Unit2:Photo1
(pictured on April 2nd, 2011) - Near of the Sea Water intake of Unit2:Photo2
(pictured on April 2nd, 2011) - Near of the Sea Water intake of Unit2:Photo3
(pictured on April 2nd, 2011) - Near of the Sea Water intake of Unit2:Photo4
(pictured on April 2nd, 2011)
2011.4.1
Download
- Near of the Sea Water intake of Unit2 in Fukushima Daiichi Nuclear Power Station
(pictured on April 1st, 2011)
2011.4.1
Download
- Dispersing Dust Protectant, Common Pool Area
(pictured on April 1st, 2011)
2011.4.1
Download
- Water pumping using a concrete pumping car for Unit 4 of Fukushima Daiichi Nuclear Power Station
(Video on March 24th, 2011)
March, 2011
2011.3.29
Download
- Control room for Unit 4 of Fukushima Daiichi Nuclear Power Station
(pictured on March 29th, 2011)
2011.3.27
Download
- Control room for Unit 2 of Fukushima Daiichi Nuclear Power Station
(pictured on March 26th, 2011)
2011.3.24
Download
- Control room for Unit 1 of Fukushima Daiichi Nuclear Power Station
(pictured on March 24th, 2011)
2011.3.24
Download
- Temporary monitoring post
(pictured on March 22nd, 2011 at Kashiwazaki-Kariwa Nuclear Power Station)
2011.3.23
Download
- Grid line connection work to offsite power grid (Okuma line)
(pictured on March 18th, 2011) - Installation work of switchgear car
(pictured on March 18th, 2011) - Grid line connection work to offsite power grid (Yonomori line)
(pictured on March 20th, 2011) - Grid line connection work to offsite power grid (Yonomori line)
(pictured on March 20th, 2011)
2011.3.23
Download
- Control room for Unit 3 of Fukushima Daiichi Nuclear Power Station
(pictured on March 22nd, 2011) - Control room for Unit 3 and 4 of Fukushima Daiichi Nuclear Power Station
(pictured on March 22nd, 2011)
2011.3.22
Download
- Water pumping using a concrete pumping car : Photo1
(pictured on March 22nd, 2011) - Water pumping using a concrete pumping car : Photo2
(pictured on March 22nd, 2011)
- Water pumping using a concrete pumping car : Video1
(Video on March 22nd, 2011) - Water pumping using a concrete pumping car : Video2
(Video on March 22nd, 2011)
2011.3.21
Download
- Unit 3 of Fukushima Daiichi Nuclear Power Station(1)
(pictured on March 21st, 2011) - Unit 3 of Fukushima Daiichi Nuclear Power Station(2)
(pictured on March 21st, 2011)
2011.3.17
Download
- Unit 3 of Fukushima Daiichi Nuclear Power Station (pictured from a helicopter)
(pictured on March 16th, 2011) - Unit 4 of Fukushima Daiichi Nuclear Power Station (pictured from a helicopter) : Photo1
(pictured on March 16th, 2011) - Unit 4 of Fukushima Daiichi Nuclear Power Station (pictured from a helicopter) : Photo2
(pictured on March 16th, 2011)
- Fukushima Daiichi Nuclear Power Station (Video from a helicopter) : Video1
(Video on March 16th, 2011) - Fukushima Daiichi Nuclear Power Station (Video from a helicopter) : Video2
(Video on March 16th, 2011) - Fukushima Daiichi Nuclear Power Station (Video from a helicopter) : Video3
(Video on March 16th, 2011)
2011.3.16
Download
- Unit 4 of Fukushima Daiichi Nuclear Power Station
(pictured on March 15th, 2011) - Unit 1 - 4 of Fukushima Daiichi Nuclear Power Station
(pictured on March 15th, 2011)
2011.3.13
Download
- Unit 1 of Fukushima Daiichi Nuclear Power Station
(pictured on March 12th, 2011)
No comments: