An electrical failure led to the loss of cooling systems at the fuel pools of Fukushima Daiichi units 1, 3 and 4, as well as the shared pool. The systems at the three units are now back in operation, while that of the shared pool is under repair.
Michele Kearney's Nuclear Wire
Major Energy and Environmental News and Commentary affecting the Nuclear Industry.
Tuesday, March 19, 2013
Fukushima pool cooling resumes after power loss
Fukushima pool cooling resumes after power loss (http://www.world-nuclear- news.org/RS-Power_loss_ interrupts_Fukushima_pool_ cooling-1903134.html)
An electrical failure led to the loss of cooling systems at the fuel pools of Fukushima Daiichi units 1, 3 and 4, as well as the shared pool. The systems at the three units are now back in operation, while that of the shared pool is under repair.
An electrical failure led to the loss of cooling systems at the fuel pools of Fukushima Daiichi units 1, 3 and 4, as well as the shared pool. The systems at the three units are now back in operation, while that of the shared pool is under repair.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment