Michele Kearney's Nuclear Wire

Major Energy and Environmental News and Commentary affecting the Nuclear Industry.

Wednesday, April 3, 2013

NRC Event Notification Perry Nuclear Plant 2/19


To top of page
Power Reactor Event Number: 48769
Facility: PERRY
Region: 3 State: OH
Unit: [1] [ ] [ ]
RX Type: [1] GE-6
NRC Notified By: THOMAS MORSE
HQ OPS Officer: BILL HUFFMAN
Notification Date: 02/19/2013
Notification Time: 16:39 [ET]
Event Date: 02/19/2013
Event Time: 13:03 [EST]
Last Update Date: 02/19/2013
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(xi) - OFFSITE NOTIFICATION
50.72(b)(3)(xii) - OFFSITE MEDICAL
OTHER UNSPEC REQMNT
Person (Organization):
KENNETH RIEMER (R3DO)

Unit SCRAM Code RX CRIT Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 96 Power Operation 96 Power Operation
Event Text
TRANSPORT OF POTENTIALLY CONTAMINATED WORKER AND SUBSEQUENT FATALITY

"On February 19, 2013, at approximately 1303 EST, the control room was notified that a supplemental worker (i.e., a contract individual) had fallen and was injured. The worker was in a contaminated area.

"Due to the individual's condition, the individual was not surveyed by a Health Physics technician prior to being transported in their anti-contamination clothing. The individual was transported by ambulance accompanied by Health Physics personnel to the local hospital for medical treatment (i.e., TriPoint Medical Center). Subsequently, the worker was declared deceased at the hospital.

"This notification is being made in accordance with 10 CFR 50.72(b)(3)(xii) and 50.72(b)(2)(xi). Additionally, OSHA was notified pursuant to the requirements of 29 CFR 1904.39. The Lake County Coroner was also notified.

"Subsequent surveys found no contamination on the worker, hospital, medical personnel, or ambulance.

"No press release is planned. The NRC Resident Inspector has been notified."

No comments:

Post a Comment