Peach Bottom Atomic Power Station, Delta, Pennsylvania
These 1974-commissioned reactors could continue generating well into
the 2050s, thanks to a successful extended power uprate—conducted while
the plant operated at over 92% annual capacity factor during the
six-year project.
http://accessintelligence.imirus.com/Mpowered/book/vpow16/i11/p30
No comments:
Post a Comment