US NRC proposes $140,000 civil penalty for CROs accessing the internet without authorization
The Nuclear Regulatory Commission has proposed a $140,000 civil penalty against
Entergy Operations, Inc. at the River Bend Station, for control room operators accessing the
internet without authorization and failure by the utility to take timely corrective actions once
the issue was identified.
http://www.nrc.gov/reading-rm/doc-collections/news/2012/12-003.iv.pdf
Entergy Operations, Inc. at the River Bend Station, for control room operators accessing the
internet without authorization and failure by the utility to take timely corrective actions once
the issue was identified.
http://www.nrc.gov/reading-rm/doc-collections/news/2012/12-003.iv.pdf
No comments:
Post a Comment