Sellafield clean-up cost reaches £67.5bn, says report
The
cost of cleaning up the Sellafield nuclear waste site has reached
£67.5bn with no sign of when the cost will stop rising, according to a
report.
http://www.bbc.co.uk/news/uk-england-cumbria-21298117
No comments:
Post a Comment