Tsuruga 2 sits on active fault, NRA concludes
The restart of unit 2 of the Tsuruga nuclear power plant in Japan's
Fukui prefecture has been thrown into doubt after the Nuclear Regulation
Authority (NRA) accepted a report compiled by a panel of experts that
concluded the unit sits upon an active fault line. However, plant owner
Japan Atomic Power Company says it still plans to apply for safety
checks in order to restart it.http://www.world-nuclear-news.org/RS-Tsuruga-2-sits-on-active-fault-NRA-concludes-2603155.html
No comments:
Post a Comment