Power Gen Emergency Response Solutions To
meet current safety regulations, a large and aging power facility
needed to update safety shower systems throughout its integrated
gasification area. While the facility had an abundance of cold potable
water, each unit in the building required a tempering water system to
meet specific ANSI water temperature mandates.
Haws Integrated™ worked directly with
the power company to design and install a custom safety system that not
only accounted for the project’s specific design conditions, but also
brought the entire power facility up to code.
Download this free white paper from Haws Intergrated! Read More
Share: |
From our Sponsor
|
|
No comments:
Post a Comment