Michele Kearney's Nuclear Wire

Major Energy and Environmental News and Commentary affecting the Nuclear Industry.
Showing posts with label Entergy. Show all posts
Showing posts with label Entergy. Show all posts

Thursday, December 9, 2010

NRC issues new rules for buried cables

Logo of the United States Nuclear Regulatory C...Image via WikipediaBRATTLEBORO -- The Nuclear Regulatory Commission announced new rules Tuesday regarding submerged cables at all nuclear plants.
Based on a recent review, the NRC staff identified 269 cable failures at nuclear facilities across the country, including 65 sites and 104 reactor units, Neil Sheehan, a spokesman for the NRC wrote in an e-mail.
NRC staff stated that cable failures have a variety of causes, including manufacturing defects, damage caused by shipping and installation and exposure to electrical transients or abnormal environmental conditions during operation.
The likelihood of failure from any of these factors increases over time as the cable insulation degrades and/or is exposed to water, the document states.
"The submerged electrical cable issue is not that the cables fail immediately, it’s that the moisture causes the cable insulation to degrade faster than expected, leading to shorter service lifetime," director of nuclear safety project for the Union of Concerned Scientist, David Lochbaum wrote in an e-mail.
The NRC notes that, "These failure data indicated an increasing trend in underground cable failures and the predominant contributing factor was submergence or moisture intrusion that degraded the insulation."
Vermont Yankee is one of the plants to experience cable submergence, Sheehan wrote. More athttp://www.reformer.com/ci_16803140?source=most_viewed

Enhanced by Zemanta

Saturday, December 4, 2010

2nd UPDATE: NRC: No Environmental Impact From Indian Point Relicensing

NEW YORK (Dow Jones)--The federal nuclear regulator said Friday no environmental impact exists to prevent Entergy Corp.'s (ETR) Indian Point nuclear power plant in New York from operating an additional 20 years.
The report, issued by the staff of the U.S. Nuclear Regulatory Commission, or NRC, is the latest development in an ongoing battle over the future of the plant that supplies, on average, roughly a quarter of the power for New York City and Westchester County, according to company statisticshttp://online.wsj.com/article/BT-CO-20101203-713055.html
Enhanced by Zemanta

Wednesday, December 1, 2010

NRC Grants Cooper Nuclear Station 20-Year License Renewal

NRC Grants Cooper Nuclear Station 20-Year License Renewal
The NRC has granted the 830-MW Nebraska Public Power District-owned Cooper Nuclear Station an extended 20-year operating license, PowerGen Worldwide reported. The NRC said that "after careful review of the plant's safety systems and specifications, the staff concluded that there were no safety concerns that would preclude license renewal and that the applicant had effectively demonstrated the capability to manage the effects of plant aging." The plant went online in 1972, the Associated Press reported.
Enhanced by Zemanta

Monday, November 22, 2010

Andrew Cuomo must not shut Indian Point nuclear plant, which provides safe, clean and cheap power BY Gwyneth Cravens and Dan Yurman

The Indian Point Energy Center in Westchester County produces 2,000 megawatts of electricity - about one-third of the metro area's needs. It powers Metro-North and the subway system, which transport an average weekday ridership of 5.1 million. Like the circus strongman at the base of a human pyramid, Indian Point supports the statewide grid of high-voltage transmission lines that protects against power failures. An economic engine for the state, Indian Point directly provides about 2,500 jobs. Unlike the fossil fuel plants that produce most U.S. energy, Indian Point emits no air pollution, and it keeps the lights on at a low cost.
So why does Gov.-elect Andrew Cuomo want to shut it down? He says it's unsafe, a target for terrorists and that replacement power can be found without short- or long-term consequences.
These claims are untrue. Cuomo and some of his political supporters appear to get their ideas about Indian Point from watching "The Simpsons."
This is irresponsible. More at


Read more: http://www.nydailynews.com/opinions/2010/11/22/2010-11-22_cuomo_dare_not_pull_the_plug.html#ixzz162OOPKAo
http://www.nydailynews.com/opinions/2010/11/22/2010-11-22_cuomo_dare_not_pull_the_plug.html
Enhanced by Zemanta

Monday, November 15, 2010

Entergy Exploring Sale Of Vermont Yankee Nuclear Plant

http://www.nuclearpowerdaily.com/reports/Entergy_Exploring_Sale_Of_Vermont_Yankee_Nuclear_Plant_999.html
New Orleans LA (SPX) Nov 15, 2010 - Entergy has announced a process is under way to explore the potential sale of Vermont Yankee, its 605-megawatt nuclear plant in Vernon, Vt. The sale process is being conducted on a confidential basis and no additional details will be released at this time. While no decision has been made to sell the plant, the company expects interest from multiple parties. The plant has an outstandi ... more
Enhanced by Zemanta

Saturday, November 13, 2010

An Uncertain Nuclear Countdown By MATTHEW L. WALD

The Vermont Yankee nuclear plant in Vernon, Vt., on the banks of the Connecticut River.Associated Press The Vermont Yankee nuclear plant in Vernon, Vt., on the banks of the Connecticut River.
Green: Business
If the clock is ticking on the lifetime of the Vermont Yankee nuclear plant, when will it actually close?
As I write in Friday’s Times, Entergy, which bought the plant in 2002, is looking for a buyer because the state Legislature has refused to give the company permission to run it after Vermont Yankee’s initial 40-year license expires in March 2012. (What is more, one of its top opponents in the Legislature was elected governor on Tuesday.)
But if the Legislature does not relent, it may not last even that long.
http://green.blogs.nytimes.com/2010/11/05/an-uncertain-nuclear-countdown/
Enhanced by Zemanta

Tuesday, November 9, 2010

Vermont's Great Green Election Day Victory -- Kick out the Nuclear Plant



Vermont's new governor pledged to shut its leaking nuclear site. And the town closest to that reactor has voted to take it by eminent domain if necessary. READ MORE
By Harvey Wasserman / AlterNet

Enhanced by Zemanta

Nuclear Executive Roundtable

As the United States continues to look for clean, reliable energy to cut emissions while providing enough power for the growing country, the nuclear power industry is making plans to expand. On Feb. 16, President Obama awarded the first loan guarantee for a nuclear plant under the provisions of the Energy Policy Act of 2005. The award of $8.3 billion for two additional reactors at the Vogtle plant in Georgia is conditional until the plant receives a combined construction and operating license from the NRC, which is expected in 2011.

Southern Co. is not the only energy provider looking to build the first nuclear reactors in the U.S. Along with modular design and the financial battle of building new nuclear, nuclear power has been grabbing headlines across the globe.

In a series of interviews, Power Engineering magazine Associate Editor Brian Wheeler moderated this year’s Nuclear Power Executive Roundtable.

Participants included John Herron, president, CEO & chief nuclear officer of Entergy Nuclear; Mark Marano, Areva senior vice president of U.S. new build operations; Danny Roderick, GE Hitachi Nuclear Energy's senior vice president for new plant projects; Christofer Mowry, president & CEO, B&W Modular Nuclear Energy, LLC; and Deva Chari, Westinghouse senior vice president of Nuclear Power Plants.

There has been a lot of talk about the possibility of a nuclear renaissance globally. What is the outlook for new nuclear projects over the next couple of years, especially given the global recession? More at:
http://www.powergenworldwide.com/index/display/articledisplay/4012739868/articles/powergenworldwide/nuclear/reactors/2010/10/nuclear-roundtable.html
Enhanced by Zemanta

Monday, November 8, 2010

VY plant's closure likely to affect grid

BRATTLEBORO -- An energy needs assessment has identified eventual overload problems on the New England grid in the near-future relating to the expected closure of the Vermont Yankee nuclear power plant in March 2012.
The computer simulated assessment from the Independent System Operator (ISO) New England reports Vermont and New York could face overloads -- defined as more electricity flowing through the system's equipment than it can handle, which could lead to the lines heating up, sagging, possibly melting and eventually shutting down -- in the system if the nuclear facility goes out of service once its license expires in roughly 17 months.
New Hampshire lines could face severe overloads with certain combinations of large transmission lines out of service, according to the early assessment on the region's transmission grid and its reliability.
Advocates for the 38-year-old Vermont Yankee point to this document as further evidence of the facility's importance to the energy grid. Opponents are not surprised with the assessment, saying that any time a generating source is taken offline there is always a temporary energy shortage.
But local electric companies are reaching out to stakeholders and other interested parties to inform them about the context of Vermont Yankee's possible closure and its impact at the regional level.
Chris Dutton, CEO of Vermont Electric Power Company, Inc. (VELCO), said problems within the state would likely revolve around low voltage issues -- such problems are likely resolvable with minor equipment modifications in different substations.
"In New Hampshire, however, it appears the situation is more acute and that there will actually be lines that overload if Vermont Yankee is not relicensed," he said. "The impacts are greater in New Hampshire in part because the load centers in New Hampshire are closer to the plant than is the load center in Vermont, which is in Burlington."
However, simulated findings showed potential deficiencies were expected to rise under certain conditions in 2018 absent improvements to the grid, which were similar with or without Yankee in operation.
The most recent Vermont Needs Assessment was partially in response to the February vote by the State Senate to block plant owner Entergy Corp.'s relicensing bid. The report was designed to analyze scenarios of the potential affects of Yankee permanently going out of service.
An updated needs assessment focusing on a future without Yankee online is currently under way and is expected to go public at the end of the year. A follow-up solutions assessment report is likely to be released in the first quarter of 2011.
According to Dutton, the idea behind the assessment is to gauge the entirety of the system and test its robustness both in a steady state, but also assuming the largest negative effect that may occur as well.
"Whatever would cause the most disruption; they assume that occurs and they see how the system responds to that adverse affect. That is called the ‘N-minus-1,'" he said.
"They have engaged in this N-minus-1 approach, and what they're doing is they're looking 10 years out to 2020 and they're assuming Vermont Yankee is not relicensed," Dutton added. "And then they look at the system with what they think are appropriate assumptions about the generating plants that are running and the state of the transmission system at that time as they anticipate it would be, and then they say, ‘OK, let's assume the event that has the single biggest impact occurs, how does the system respond?'"
The follow-up assessment expected to come up later this year will also chronicle if another crisis happens in addition to the N-minus-1 approach.
Vermont Yankee, located in Vernon on the banks of the Connecticut River, has generated power since 1972. Energy officials have claimed portions of the regional grid have been built around the plant, so consequently, its closure would have an adverse affect on the New England power supply.
Yankee spokesman Larry Smith concurred with the ISO findings, saying the nuclear facility has a reliable and stable record during its operation.
"We agree with the ISO assessment that there could be some instability within the grid with the loss of Vermont Yankee and its 650 megawatts of baseload power," he said.
VELCO has not taken a position regarding the future of Vermont Yankee as Entergy has lobbied to extend the site's license for 20 years.
"That's a position that we take with every power source and we're required to take. We can't show favorites based on kinds of fuel -- we are zealous protectors of system reliability," said Kerrick Johnson, VELCO's vice president for external affairs.
But given the timing, VELCO must plan as if Yankee is not going to operate past its licensing date, Johnson added.
"It is our job to make sure the system is reliable and we assume that Vermont Yankee is there. We find that it has benefit to the grid when it runs ... but it is our responsible simply to make sure the system stays reliable," Dutton said.
Sandy Levine, senior attorney for the environmental nonprofit Conservation Law Foundation (CLF), said the loss of Vermont Yankee's energy was expected; as it would be when any significant power supply goes offline.
"It highlights some change that need to be made to address Yankee no longer producing power," she said. "It also highlights some transmission upgrades to address that. It's possible to address any problems with the grid through generation and energy efficiency that is more local to the power demand."
Groups such as CLF and NEC, both of whom oppose the relicensing of Yankee, also describe the recent assessment as "unalarming" because of a continuing excess of power in the region, claiming the grid does not require the nuclear facility in its long-term power supply needs.
http://www.reformer.com/localnews/ci_16538647
Enhanced by Zemanta

AMERICAN NUCLEAR SOCIETY ANNOUNCES AVAILABILITY OF EXPERTS TO DISCUSS NUCLEAR ENERGY ISSUES Leading Industry Professionals Available to Share Knowledge and Expertise Concerning Nuclear Issues of Importance to Vermont

FOR IMMEDIATE RELEASECONTACT:
November 8, 2010Jackie Clark, 301-987-7113, 301-641-3750 cell
Fritz Schneider:  (301) 728-4811

AMERICAN NUCLEAR SOCIETY
ANNOUNCES AVAILABILITY OF EXPERTS TO DISCUSS
NUCLEAR ENERGY ISSUES
Leading Industry Professionals Available to Share Knowledge and Expertise
Concerning Nuclear Issues of Importance to Vermont

WHAT:Nuclear industry experts to inform audiences about scientific and regulatory issues

WHEN:Available Now!

WHO:Edward L.  Quinn:
Former American Nuclear Society (ANS) President
ANS member for more than 25 years

Candace Davison:
 Master’s Degree in Environmental Engineering
 ANS member for more than 15 years
Chairperson of American Nuclear Society Public Information Committee
Senior Reactor Operator

Mary Lou Dunzik-Gougar
ANS member for more than 20 years
Incoming Chairperson of the Fuel Cycle and Waste Management Division of ANS Nuclear Engineer
Professor of Nuclear Engineering

Some Topics Include:

Licensing Transfer – What steps and what regulations must be observed to transfer a license for an operating nuclear power plant

Workforce Continuity – If an operating plant’s ownership is transferred, how will the public be assured that a trained workforce will be in place to assure continuity of operations

Radiation and Relative Risk – how a transatlantic flight or eating a banana is a radiation event

These uniquely experienced and knowledgeable individuals can help navigate complex questions of science and public policy on issues of importance to citizens of Vermont.

They will provide solid science, unemotionally and understandably, so that decisions about Vermont’s energy future can be made on facts, not myth.

For more information about the conference please visit www.ans.org.

Established in 1954, ANS is a professional organization of engineers and scientists devoted to the peaceful applications of nuclear science and technology.  Its 11,000 members come from diverse technical backgrounds covering the full range of engineering disciplines as well as the physical and biological sciences.
Enhanced by Zemanta

Saturday, November 6, 2010

An Uncertain Nuclear Countdown By MATTHEW L. WALD

An Uncertain Nuclear Countdown

The Vermont Yankee nuclear plant in Vernon, Vt., on the banks of the Connecticut River.Associated Press The Vermont Yankee nuclear plant in Vernon, Vt., on the banks of the Connecticut River.
Green: Business
If the clock is ticking on the lifetime of the Vermont Yankee nuclear plant, when will it actually close?
As I write in Friday’s Times, Entergy, which bought the plant in 2002, is looking for a buyer because the state Legislature has refused to give the company permission to run it after Vermont Yankee’s initial 40-year license expires in March 2012. (What is more, one of its top opponents in the Legislature was elected governor on Tuesday.)
But if the Legislature does not relent, it may not last even that long.
Enhanced by Zemanta

Friday, November 5, 2010

Exelon may bid on Vermont nuclear plant

Constellation, Exelon among potential bidders for Vt. plant
Constellation Energy Group, Exelon and NextEra Energy may bid for Entergy's Vermont Yankee nuclear plant, analyst Brian Chin said. Entergy said it was considering selling the plant, months after state lawmakers agreed to its 2012 shutdown. "We will aggressively negotiate with buyers for extension of employment to all current employees as a condition of any sale," Entergy said. Crain's Chicago Business/Reutershttp://www.chicagobusiness.com/article/20101104/NEWS11/101109909/exelon-may-bid-on-vermont-nuclear-plant
Enhanced by Zemanta

Tuesday, October 26, 2010

PSEG Nuclear One Step Closer to Renewing Licenses for South Jersey Nuclear Plants Nuclear Regulatory Commission issues draft Environmental Impact Statements, public hearings scheduled for next month


 The Nuclear Regulatory Commission (NRC) yesterday said it has issued draft Environmental Impact Statements for the license renewal of the Hope Creek and Salem I and II nuclear units. It also said the option of a 20-license renewal should be left open to energy-planning decision-makers. New Jersey relies on nuclear to a much larger extent than other states, so the renewal decision could greatly affect the reliability of the grid.

In reviewing the renewal applications, the NRC staff found most of the environmental impacts are either small or moderate, according to Neil Sheehan, a spokesman for the federal agency.
“At this point, they have not found any show-stoppers,” Sheehan said. The agency plans to hold public hearings on November 17 at the Salem County Emergency Services Building in Woodstown at 1:30 p.m. and 7 p.m.

http://www.njspotlight.com/stories/10/1025/2123/

Enhanced by Zemanta

Thursday, October 21, 2010

Vt. DPS chief: VY is safe

Vt. official says Vermont Yankee plant continues to operate safely
Entergy's Vermont Yankee nuclear power plant can continue to operate safely, said David O'Brien, commissioner of the state Department of Public Service. "The plant scores highly in industry peer review, and its problems, although well-publicized, do not pose health concerns," he said during the 90th annual meeting of Associated Industries of Vermont. The facility and renewable sources should each be included in the state's future, O'Brien said. Brattleboro Reformer (Vt.)
Enhanced by Zemanta

Friday, September 24, 2010

State: VY leaks had little effect on public

Report: Communities near Vt. plant are healthy
There is no evidence of "significant adverse health effects" from the communities near Entergy's Vermont Yankee plant in 2009, according to the Vermont Department of Health. The facility's operations complied with the state's radiological health standard, even after tritium was found in water supplies near the plant. Brattleboro Reformer (Vt.)http://www.reformer.com/localnews/ci_16149302
Enhanced by Zemanta

Thursday, September 23, 2010

Exelon Nuclear Marks 50 Years of Nuclear Power during Dresden Unit 1 Celebration

Entergy celebrates 50th anniversary of Dresden Unit 1 startup
Exelon Nuclear celebrated the 50th anniversary of Dresden Unit 1, the first U.S. full-scale nuclear power plant that was privately funded, with a luncheon at the Dresden Station Training Building in Illinois. Though the commercial plant is dormant, the unit is seen as a key role in the nuclear power industry. "We're proud of the pioneers who worked on Dresden Unit 1, and the roles they played in ushering in the nuclear power industry," said Susan Landahl, chief operating officer for Exelon Nuclear. NuclearStreet.com
Enhanced by Zemanta

NY sees reliable power system, but warns of risks

United States Power GridImage via WikipediaReport: Retirement of Indian Point could threaten N.Y. power grid
The possible shutdown of Entergy's Indian Point nuclear plant could threaten New York's reliability needs, according to a report by the New York ISO, the state's power grid operator. Reliability breaches could occur in 2016 if the nuclear facility's operating licenses expire in 2013 and 2015, the report added. Those violations could involve the loss of power in the New York City metro area. Reuters
Enhanced by Zemanta

Friday, September 17, 2010

Vermont Yankee cleanup fund has returned to pre-2008 levels

The decommissioning fund for Entergy's Vermont Yankee nuclear plant had $440 million at the end of August, which is about the same amount it had before the financial crisis began in 2007. The trust fund may fall short of the amount needed to pay for the plant's shutdown, which is slated for 2012 or 2032, warned Arnie Gundersen, a consultant to Vermont's Joint Fiscal Office. Brattleboro Reformer (Vt.) (9/16
Enhanced by Zemanta

Wednesday, September 8, 2010

Grand Gulf: Plant has benefitted state

Grand Gulf is a safe, reliable asset to Mississippi
Entergy's Grand Gulf Nuclear Station was opened amid controversy 25 years ago, but the concerns raised then seem insignificant today, according to an editorial in The Clarion-Ledger of Jackson, Miss. Now that the plant may be expanding, it deserves the support of the people, the newspaper says. "A second unit could be in the future for Grand Gulf. Overall, Grand Gulf has benefited Mississippi and the region and will for many years to come." The Clarion-Ledger (Jackson, Miss.)
Enhanced by Zemanta

NRC wants Entergy to re-evaluate aging underground pipes

Entergy is urged to reassess Vt. plant's pipeline system
Federal regulators have urged Entergy to review its plan for handling pipelines carrying radioactivity as a condition of its license-extension bid for the Vermont Yankee nuclear plant. Though the company "accurately and completely" detailed different safety systems in its application, it left out the advanced off-gas system, which was the source of the tritium leak last year, the Nuclear Regulatory Commission said in a report. "We wanted to ensure the Vermont Yankee license-renewal application accurately captured details of the plant's program for managing the effects of aging on key safety systems," said NRC spokesman Neil Sheehan. The Times Argus (Barre-Montpelier, Vt.)
Enhanced by Zemanta